{"id":7851,"date":"2025-03-14T14:04:55","date_gmt":"2025-03-14T14:04:55","guid":{"rendered":"https:\/\/solarwindfinland.fi\/?p=7851"},"modified":"2025-09-04T05:48:25","modified_gmt":"2025-09-04T05:48:25","slug":"posiolle-kehitetaan-sahkoakkuvarastoa","status":"publish","type":"post","link":"https:\/\/solarwindfinland.fi\/en\/posiolle-kehitetaan-sahkoakkuvarastoa\/","title":{"rendered":"New BESS project in Posio"},"content":{"rendered":"<p>Building permit has granted and is legally valid<\/p>\n\n\n\n<p>The municipality of Posio has granted Solarwind Finland Oy a building permit for a battery energy storage facility to be constructed in the Raistakka area. This permit is one of approximately 20 ongoing projects being developed by Solarwind Finland. The capacity of the Posio battery storage facility will be 25 MW \/ 50 MWh. It will be built about one kilometer from Caruna\u2019s Posio substation, along the Ranuantie road.\n\nTechnical planning has begun, including dynamic simulations required for grid connection compliance. Solarwind Finland is advancing the project and believes that an investment decision could be made once sufficient studies have been completed\u2014possibly during the first half of the year.<\/p>\n\n\n\n<p>Antti Tiri, Business Director, BESS<\/p>\n\n\n\n<p>Kimmo Kaila, CEO<\/p>","protected":false},"excerpt":{"rendered":"<p>Rakennuslupa my\u00f6nnetty ja saanut lainvoiman Posion kunta on my\u00f6nt\u00e4nyt Solarwind Finland Oy:lle rakennusluvan Raistakan alueelle rakennettavalle s\u00e4hk\u00f6akkuvarastolle. Rakennuslupa on toinen Solarwind Finlandin kehitt\u00e4mist\u00e4 hankkeista, joita on t\u00e4ll\u00e4 hetkell\u00e4 k\u00e4ynniss\u00e4 noin 20. Posion akkuvaraston kapasiteetti on 25 MW \/ 50 MWh. S\u00e4hk\u00f6akkuvarasto rakennetaan noin kilometrin p\u00e4\u00e4h\u00e4n Carunan Posion s\u00e4hk\u00f6asemasta Ranuantien varteen. Tekninen suunnittelu, kuten esim. verkkoliitynn\u00e4n&#8230;<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"disable","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-7851","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/solarwindfinland.fi\/en\/wp-json\/wp\/v2\/posts\/7851","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solarwindfinland.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solarwindfinland.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solarwindfinland.fi\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/solarwindfinland.fi\/en\/wp-json\/wp\/v2\/comments?post=7851"}],"version-history":[{"count":2,"href":"https:\/\/solarwindfinland.fi\/en\/wp-json\/wp\/v2\/posts\/7851\/revisions"}],"predecessor-version":[{"id":7892,"href":"https:\/\/solarwindfinland.fi\/en\/wp-json\/wp\/v2\/posts\/7851\/revisions\/7892"}],"wp:attachment":[{"href":"https:\/\/solarwindfinland.fi\/en\/wp-json\/wp\/v2\/media?parent=7851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solarwindfinland.fi\/en\/wp-json\/wp\/v2\/categories?post=7851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solarwindfinland.fi\/en\/wp-json\/wp\/v2\/tags?post=7851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}